Worked on my house Friday and Saturday. I was too wore out to work on Sunday.
Got the pony wall for the master shower built. I made it lower than the height of my wife's tits so I have a view
Because of the beam placement holding the second floor up (and the fact that I'm not going to notch that beam to fit the plumbing), I had to build a wall out 4" in the upstairs guest bathroom so the tub would be centered on the drain.
Went through four cans of foam ceiling up the electrical wire, gas & plumbing penetrations (and all of the old penetrations as well). I still need to seal around the doors and windows as well inside so I'll need another couple of cans of foam.
Got the doorbell wiring in and the power to the doorbell transformer in. I put it in the downstairs coat closet so if I need to replace the transformer in the future, it'll be easy to do.
Last week, my electrician got the upstairs cans cut out in the sheetrock and the wiring ran to them all. He wired up about a 1/3rd of the panel as well. I'm gonna have him install the lighting under the porch, run the wiring and data for the gate opener and put in the smurf tube for future wiring upgrades later this week.