Tired and Lazy, married to ‘The Laundry Fairy’
I poured 1,280 pounds of concrete today. Still need to pour another 1,600 pounds to fill up this stupid trench. This will all be getting covered with tile so the surface finish doesn't matter.
View attachment 51280
I got this area all cleaned up as well. All of the extra copper wire, PVC pipes and scrap lumber was loaded up in my trailer. Mowed the back yard but couldn't do the front yard become my neighbor was having a party and I didn't want to interrupt.
Mixing by hand or portable machine?