That shit didn't happen, will start this weekend if the local stealership has the 111mm studsAlmost have all the parts for the rear elocker swap, hoping to have time before tax season starts
Pulled the runner into the garage last night "just to PB blast all the bolts" and before I knew it the old axle was almost completely out. Tonight I'll pull the old and put the new seals, etc in the E locker axle, possibly run the wiring. I haven't got a shipping confirmation from Marlin yet on the studs so I'm trying to pace myself.
Yep, been DD'd all weekIs this thing running again?
$850 delivered isn't bad for a nice rackOkay; that is a sexy roof rack. But that $$$ is much.
Isn't that how most aftermarket racks are mounted?
I'll drop the knuckle off at a local shop to have the new bearings, etc pressed in and the UBJ's can be done once I reinstallThat sounds like a few maintenance days.
I've always had good luck with NAPA parts stores having the studs.Yeah I pulled the elocker axle at the JY in about 30 mins (stopping repeatedly because I don't trust JY "jackstands") and I already have all the wiring ready to plug and play. I don't expect it to take too long. I called the local stealership after my last post and they can't get the studs for 2 WEEKS! Too bad Amazon doesn't carry, I'll just put it all together and then wait for the studs to get here (purchased online).