PSU Taco85
Well-Known Member
Gut it all and keep only PEX going forward. CPVC is a ticking time bombWorked late last night to fill up the remaining empty spaces in the dumpster. I couldn't stand the thought of sending back a dumpster that still had space in it.
Found more bad contractor work which has basically convinced me that this will be a full gut and build back job.
This house has every generation of plumbing too. Copper, PVC, CPVC, Galvanized pipe and PEX.

