Took off work on Friday to go pick up the 3"x8" beams I needed to fix the left side of my pier. I got one 18'L, two 14'L and one 10'L beams. Thankfully I had my brother's 18' trailer to use to go get them as it would've sucked to get those with my little 10' trailer

But I got rained out on Friday and it was really hot so I called it a day at 2PM.
On Sunday, I had a professional waterproofer that I use at work, come over and waterproof my house with Sika NP1. He got about 85% of the house finished. Pretty awesome to have him come out and do it since this house has had terrible water leaks since it was built.
On my piers boathouse, I put in a couple of 5" stainless timber screws on all of the 2"x12" to piling connections to reinforce it.
My nephew and I got the 18' beam in surprisingly easy and then we took off the old platform boards, installed a new 6' beam on the far side of the pier and then put the deck back on. I didn't take any pics during all of this unfortunately. I still need a piece of 2"x12" to fill in that open section and I need to get a contractor out to install three more pilings to help support the beam. All of the decking was wood I had taken off the house or had gotten for free.
My M12 impact after this job

I think it's finally starting to go because I've been using it for everything.