Took a half day today to meet with the appliances subcontractor.
Tile guy got the quartz in for the master shower. He got the tub tile installed and the downstairs shower grouted today.
I got some of the downstairs base installed. I'm going to have to install a shoe moulding to hide the gap.
I got the living and kitchen base installed as well today.
Tomorrow I'll install the hallway base and bedrooms base.