Friday-Sunday- I got the master bathroom shiplap finished and the door installed. I got the baseboards in the master & master bath installed as well. I also got the garage door installed (it went surprisingly easy despite it weighing a freaking ton, it's the heaviest prehung door I've ever installed).
Garage door
On Friday- the kitchen cabinets were delivered. It took 4 guys an hour to unload all of the cabinets and take them upstairs.
The painters worked Saturday & Sunday and got the nail holes filled, sanded and caulked all the baseboards upstairs. That M12 sander is an awesome tool and I'm so happy I got that tool. It saved a lot of time and ran for 4 hours straight.
Monday- cabinet installers came and started to unbox and lay out the cabinets. There's an issue with one cabinet being too big, so they are going to modify some other cabinets to make everything fit.
Guest bathroom cabinet-
The blue is just protective plastic.
I got the downstairs window trimmed out.
I started capping the bottom of the deck posts but this Monday was one of those days where you can't make a good cut so I called it a day after this one.