Tinfoil Hat Wearers Unite

Silverback

Lima Gulf Bravo Foxtrot Juliet Bravo
Fucking hilarious! What a bunch of dipshits.
 

tx_shooter

It is not a war crime the first time.
Staff member
Fucking hilarious! What a bunch of dipshits.

No joke. Glad we do not have something stupid like that in America.

Unrelated; anyone see how many people are getting masters degrees in underwater basket weaving with a bachelor's in interrupative dance?
 

Oswego

n00b
IDK but every single tradeshow I see is looking for skilled workers. Every single Youtube channel I watch regarding homesteading is looking for skilled labor.

When they reform immigration....lol.... never happen.... they need to not only make sure we are bringing in skilled white but also skilled blue collar workers. In another 10-20 years skilled workers will be gouging prices on everyone, because they can.
 

tx_shooter

It is not a war crime the first time.
Staff member
Already seeing the gouging with residential construction. There are areas where a contractor can add another 25% to the quote just to see if it gets approved. They are already busy enough it will not matter if they do not get it. My mother-in-law is dealing with the issue south of Charlotte.
 

Taco Loco

Tired and Lazy, married to ‘The Laundry Fairy’
IDK but every single tradeshow I see is looking for skilled workers. Every single Youtube channel I watch regarding homesteading is looking for skilled labor.

When they reform immigration....lol.... never happen.... they need to not only make sure we are bringing in skilled white but also skilled blue collar workers. In another 10-20 years skilled workers will be gouging prices on everyone, because they can.

African migrants pass through San Antonio and swiftly fan out across the country
 

Oswego

n00b

I get what you're saying, but by 'skilled workers' I mean legal professional blue collar workers in 'skilled trades', not illegal future lawn jockeys, farm hands, and gang members.

Even in our current immigration policies we elevate white collar over blue and that needs to be fixed. When shit hits the fan I'd always rather have a plumber and electrician with me than a few desk jockeys that are pro's at avoiding paper-cuts (myself included of course).
 

achirdo

2WD FTW
Already seeing the gouging with residential construction. There are areas where a contractor can add another 25% to the quote just to see if it gets approved. They are already busy enough it will not matter if they do not get it. My mother-in-law is dealing with the issue south of Charlotte.
Made $850 in two hours today. Replaced some hinges on a Dumpster Gate.
 

Anathollo

Armorall is my choice of lube
Staff member
Already seeing the gouging with residential construction. There are areas where a contractor can add another 25% to the quote just to see if it gets approved. They are already busy enough it will not matter if they do not get it. My mother-in-law is dealing with the issue south of Charlotte.
To be fair, there are some customers that justify the 25% increase in cost lol
 

Oswego

n00b
To be fair, there are some customers that justify the 25% increase in cost lol

Seems thats all I have been dealing with this year. I don't mind the $$$, but sometimes the stress that comes with working with tards is not worth it.
 

Oswego

n00b
I've got one lady I've been talking too about a patio cover. Nice and all but being a major PITA to deal with. The questions this lady has come up with are impressive

I'm doing a frame less shower for a buddy and his wife. We are currently on design 8 and quote 13. I measured 2 weeks ago yet we are still going back and forth regarding design. I would of had this thing installed and broken in already if not for her changes. They have no idea how construction works or why the re-modeler's bill is thousands more than they were quoted. She must have made three changes in the one day I was onsite to insure the carpenter put my blocking in the right spots. If I was tracking my time this job would be a total loss, but since I'm doing it for free and 3% over material costs I better get some good dinner invites out of this + some lake time since they live on one.
 

Anathollo

Armorall is my choice of lube
Staff member
I've got one lady I've been talking too about a patio cover. Nice and all but being a major PITA to deal with. The questions this lady has come up with are impressive
This is me on a daily basis. I meet with 3-4 customers per day at work. I'm constantly amazed by the shit people come up with. A researcher asked me if I could install a residential dishwasher in his lab to clean his glassware with chemicals and bio samples in it. I was like "Nope, not gonna happen bud".
f71beaed2b2a0d18a081fe28448c68ec43cc052c8c1539addfdaeede78e59800.jpg
 

achirdo

2WD FTW
I'm doing a frame less shower for a buddy and his wife. We are currently on design 8 and quote 13. I measured 2 weeks ago yet we are still going back and forth regarding design. I would of had this thing installed and broken in already if not for her changes. They have no idea how construction works or why the re-modeler's bill is thousands more than they were quoted. She must have made three changes in the one day I was onsite to insure the carpenter put my blocking in the right spots. If I was tracking my time this job would be a total loss, but since I'm doing it for free and 3% over material costs I better get some good dinner invites out of this + some lake time since they live on one.
Sounds like he owes you a night alone with his wife lol
 

achirdo

2WD FTW
This is me on a daily basis. I meet with 3-4 customers per day at work. I'm constantly amazed by the shit people come up with. A researcher asked me if I could install a residential dishwasher in his lab to clean his glassware with chemicals and bio samples in it. I was like "Nope, not gonna happen bud".
f71beaed2b2a0d18a081fe28448c68ec43cc052c8c1539addfdaeede78e59800.jpg
This lady has basically wanted my entire build process. Coming up with potential problems with a build process I'm not even gonna do, asking me how I plan on holding material in place, etc etc.

Lady this is not your problem. This is why you are hiring me to do this.
 

tx_shooter

It is not a war crime the first time.
Staff member
To be fair, there are some customers that justify the 25% increase in cost lol

I do not miss dealing with those kind of customers. I still have some special ed types; but at least they are not pulling the "my business pays your check" card.
 

Anathollo

Armorall is my choice of lube
Staff member
This lady has basically wanted my entire build process. Coming up with potential problems with a build process I'm not even gonna do, asking me how I plan on holding material in place, etc etc.

Lady this is not your problem. This is why you are hiring me to do this.
She was trying to get the details out so she could get her nephew or family member to build it! lol But yeah, I've gotten to the point where I don't have that kinda time so I just tell people to money into an account for me and then I'll contact them to schedule or talk about the work.
 

tx_shooter

It is not a war crime the first time.
Staff member
"Need a detailed quote to include hardware info" is the sign for "going to steal your time and experience to try and do it myself". I do not miss that crap.
 

Taco Loco

Tired and Lazy, married to ‘The Laundry Fairy’

Oswego

n00b
I can't say much surprises me anymore in regards to politicians. I think I'd only be amazed if we found one that wasn't corrupt or crappy at their job.

Tell you one thing for sure....whoever redrew the map of the middle east after WWII did a shity job.
 
Top